Fabrication of A20 & A21 platforms (Aboozar field)
Two well head top sides from Aboozar field was allocated to PBI for fabrication and pre commissioning. Suitable yard was mobilized in Arvand free zone area along side of Arvand River by minimum and not limited to skid way, pilling, skid beam, skid shoe, and Jetty. Each platform ha 5 floors and weight of each deck is 1250 tones in load out time.